Custom Kitchen Upgrades

Transform your kitchen with custom range hoods, floating shelves, and premium cabinet facades that add warmth and elegance without a full remodel. Our carefully designed kitchen upgrades blend modern aesthetics with timeless craftsmanship, providing high-impact, cost-effective solutions that elevate the heart of your home.

What’s Included

  • In-home consultation & precise measure

  • Concept design & layout optimization (workflow, storage planning)

  • Cabinetry design (shop drawings, door style & finish selections)

  • Countertops & surfaces (stone/solid-surface, backsplash, flooring)

  • Lighting & electrical plan (task/ambient, dedicated circuits, under-cabinet)

  • Plumbing scope (sink/disposal, dishwasher, refrigerator, gas/electric range)

  • Ventilation strategy (hood sizing/ducting per code)

  • Dust control & site protection (zip walls, floor covering, daily cleanup)

  • Project management & schedule (single point of contact, progress updates)

  • Final walkthrough & punch list (documented completion standards)

Typical Timeline

Pre-Construction (2–6 weeks, overlaps where possible)

  1. In-home visit & measure (60–90 min)

  2. Design & selections (1–3 weeks)

  3. Detailed proposal & scope lock (3–7 days)

  4. Ordering & Procurement (1–2 weeks; long-lead items may extend)

Build (6–10 weeks for a full kitchen)

  1. Site protection & demo (2–5 days)

  2. Rough-in MEP (mechanical/electrical/plumbing) & framing (1–2 weeks)

  3. Drywall/texture/prime (3–7 days)

  4. Cabinets set & templating (3–6 days)

  5. Countertops fabrication & install (lead-time dependent; 1–2 weeks)

  6. Tile/finish carpentry/paint (1–2 weeks)

  7. Final fixtures, appliances, commissioning & punch (3–7 days)

Note: Timelines vary with scope, structure changes, custom cabinetry, and inspection schedules.

 FAQs

  • Most projects land within $45k–$120k, driven choice of countertops, cabinetry, layout changes, appliances and premium finishes.

  • Yes—most clients do. We set up a temporary kitchen zone and keep dust minimal; expect 1–2 weeks without a working range and sink.

  • Absolutely when condition and layout allow; we’ll advise where reuse makes sense vs. false economy.

  • We issue a written Change Order with pricing/time impact for approval before work proceeds.